News

Hasletre gewinnt den norwegischen Holzbaupreis 2022

Hasletre wins the Norwegian Timber Construction...

Oslotre wins the Norwegian Timber Construction Prize 2022 with the 3,000 m², fully dismantled Hasletre office building.

Hasletre wins the Norwegian Timber Construction...

Oslotre wins the Norwegian Timber Construction Prize 2022 with the 3,000 m², fully dismantled Hasletre office building.

„Haus des Holzes“ von Pirmin Jung mit X-fix

“House of Wood” by Pirmin Jung with X-fix

A service and residential building made of wood is being built in Sursee/CH as a showcase for digital construction with wood.

“House of Wood” by Pirmin Jung with X-fix

A service and residential building made of wood is being built in Sursee/CH as a showcase for digital construction with wood.

X-Fix beflügelt das Wachstum von Fertighaushersteller Multicomfort!

X-Fix stimulates the growth of prefabricated ho...

Since the beginning of 2023, Multicomfort has been using X-fix as the main connecting device and key component

X-Fix stimulates the growth of prefabricated ho...

Since the beginning of 2023, Multicomfort has been using X-fix as the main connecting device and key component

X-Fix mini mit Frässchablone auf der BAU in München 2023

X-Fix mini with milling template at BAU in Muni...

Ligna Tool milling template mills X-fix mini at the BAU in Munich

X-Fix mini with milling template at BAU in Muni...

Ligna Tool milling template mills X-fix mini at the BAU in Munich

„Aktion Mensch“ Berlin / DE,  Terhalle Holzbau GmbH baut ein 6 stöckiges Hofhaus mit X-fix

“Aktion Mensch” Berlin / DE, Terhalle Holzbau G...

The project at Prinzregentenstraße 76 in Berlin-Wilmersdorf is an inclusion building project by Aktion Mensch.

“Aktion Mensch” Berlin / DE, Terhalle Holzbau G...

The project at Prinzregentenstraße 76 in Berlin-Wilmersdorf is an inclusion building project by Aktion Mensch.

„Das Bärahus“ Feldkirch / Österreich

“The Bärahus” Feldkirch / Austria

Rhomberg builds a floor within 7 hours with X-fix

“The Bärahus” Feldkirch / Austria

Rhomberg builds a floor within 7 hours with X-fix